Case Studies
APAC-PW-143 (Asia Pacific)
BLUESPARK® stimulation to improve connectivity to the reservoir by clearing out blockages resulted in a 3x increase in oil production with the job completed in less than 3 days.
SSA-SR-139 (West Africa)
After only one treatment of the SPMs with BLUESPARK®, the tractor/stroker tool was able to retrieve both GLVs on the first attempt. For the lower SPM, this was due to the ability of BLUESPARK® to clear scale from the orientation sleeve and complex shapes like the GLV latch.
NAM-SR-136 (Canada West)
Well #4 (BLUESPARK® treated well) achieved a quicker and higher ramp up in production. After factoring in flush production and incremental fluid production due to reservoir pressure communication, the client calculated there was an additional 60 m3/d of sustained gross fluid production for Well #4 vs the other wells on the same pad.
NAM-IW-130 (Canada West)
The well saw an immediate increase in injectivity. The average 3-month injection rate went from 2.2 b/d to 73.9 b/d (3200% increase).
NSEA-SR-127 (North Sea)
Blue Spark Energy successfully performed its first scale removal operation on a Side Pocket Mandrel (SPM) with Gas Lift Valve (GLV) in the North Sea using our innovative BLUESPARK® technology.
NSEA-SR-120 (North Sea)
Post BLUESPARK®, oil production increased 173% from 91.8 b/d to 250.9 b/d. Well uptime increased from 11.8% to 67.8%.