Case Studies
MENA-IW-154 (Middle East)
The salt-water injection well was cleaned of formation damage due to fines and sludge, resulting in an increase in the injection rate of 175% while reducing CO2 emissions. The oil production of the field also increased.
MENA-PW-138 (Middle East)
The aggregate oil production for the first 30-days averaged 324 BOPD, up 970% from the pre-BLUESPARK® aggregate of 30.3 BOPD, including one well (Well #4) that had zero production pre-treatment.
MENA-PW-137 (Middle East)
A 60% aggregate increase in oil production for two wells was completed in less than two days.