Case Studies
NSEA-SR-151 (Danish North Sea)
The SCSSSV scale was removed by BLUESPARK®, resulting in a successful inflow test and no need for an insert valve
NSEA-SR-145 (North Sea)
BLUESPARK® reduced scale by 80 – 100% and saved up to 5 days of operating time and USD $200K. The treatment was completed in one run in less than 14 hours of operating time.
NSEA-SR-142 (North Sea)
A Tubing Retrievable Surface Controlled Subsurface Safety Valve (TRSCSV) was made operational with BLUESPARK® in 3.5 hours, eliminating the need to shut in the well.
CE-SR-140 (Netherlands)
The mini FHUT was successful in holding a fluid column in the wellbore so that the pulsing was occurring in the required environment. A camera was run before and after the 1st BLUESPARK® run and it confirmed that scale was removed.
NSEA-SR-135 (North Sea)
An increase in control line returns was noted after the first BLUESPARK® run, indicating the flow tube and flapper were reactivated. A successful inflow test was performed on the SSSV after the 2nd run.
NSEA-SR-129 (North Sea)
The SCSSV inflow tests were successful, making the SCSSV compliant and allowing the well to be put back on production. The production of the well was maintained at 3,500 bpd.
NSEA-SR-123 (North Sea)
Blue Spark Energy successfully performed its first Sub-Surface Safety Valve (SSSV) re-activation in the Danish North Sea using our innovative BLUESPARK® technology.